Quantity takeoff
$149Cubic yards, SFCA and rebar tonnage, each traced to a sheet.
Trades
Our concrete estimating services measure and price Division 03 work for contractors, builders and developers: footings, slabs, walls, elevated decks, paving and site concrete. We report concrete in cubic yards, formwork by contact area and rebar by the ton, then price placement, finishing and curing to your market. Quantities start at $149 and priced estimates at $199, delivered in 24–72 hours.
Scope
Every element is measured from the structural drawings, sections and details,
then reported in the unit your ready-mix supplier, form crew and rebar fabricator actually use.
10element types measured on every jobChoose Your Deliverable
Choose by what you already have: your own rates and supplier prices,
or a bid-ready number built for you.
Cubic yards, SFCA and rebar tonnage, each traced to a sheet.
A bid-ready number at local rates, or your own.
A foundation contractor with a settled labor rate and a ready-mix quote usually needs the takeoff.
A general contractor carrying the concrete package, or an owner checking a bid, usually needs the priced estimate.
For whole-job quantities, see quantity takeoff or a full cost estimate.
Cost Drivers
Quality Control
Most concrete misses come from items the drawings never quite spell out.
These are the ones we check on every file.
7places concrete bids go wrongCounted from structural and architectural sheets together, with conflicts logged
Measured as separate pours, not averaged into the slab
Cross-checked against mechanical and electrical plans
Counted, and the file states who furnishes and who sets them
Listed as separate lines, or marked excluded
Priced in SF and LF, not left to the finish allowance
The file states who supplies, places and chairs it
Project Types
Scope, units and risks shift with the kind of project,
so we measure each one the way its crew builds it.

Footings, stem walls, slabs, garage floors, patios
Crawlspace piersthickened edgesfrost depth
Floors, elevated slabs, columns, shear walls
Formwork and shoringpour sequencefloor flatness
Casting slab, wall panels, pilasters
Panel formingembedslift insertsbracing
Post-tensioned or precast decks, ramps
Tendons and anchorsjointssealers
Curb, gutter, sidewalks, paving, ramps
SubbasejointsreinforcementADA slopesFor earthwork and subbase, see sitework estimating. Foundation walls built from block belong with masonry estimating.
Our Method
We measure net in place from dimensions on plans, sections and details, and check each sheet's scale against a printed dimension. Formwork counts only surfaces that need a form; earth-formed footings do not. Rebar is taken from the schedules and details, converted with standard bar weights (a #5 bar weighs 1.043 lb per foot), and reported in tons with laps and chairs stated.
We work in Bluebeam Revu, PlanSwift and On-Screen Takeoff, and we read the specification against the ACI standards it cites. Labor and material rates follow the project's zip code, or your own rates if you send them. A second estimator reviews every file before delivery.
Sample Output
A short extract of what a concrete takeoff workbook looks like,
with every quantity traced to its source.
Illustrative example, not client work.
Deliverables
Every concrete file ships with these items,
ready to check, edit and bid from.
4files in every deliveryUnlocked Excel takeoff by element and pour
Rebar summary by bar size, with a bend list where the drawings detail one
Marked-up foundation and structural plans, colour-coded
Scope-gap log: slab edges, embeds and depressions the drawings do not resolve
Who We Serve
Concrete work is bid by many kinds of teams. These are the ones we work with most.
Process
Upload drawings, specs and addenda (PDF, DWG, DXF or most CAD formats). Tell us the bid date and scope. Include structural drawings, the rebar schedule and geotech notes if available.
We review the set and send a fixed price, usually within 10 minutes during business hours. Work starts when you approve it.
Unlocked Excel, PDF summary and marked-up plans, checked by a second estimator. Revisions are included.
Pricing
Published starting prices, and a fixed quote before any work begins.
Concrete quantity takeoffs start at $149 and priced estimates at $199. The price follows the number of structural sheets and the complexity of the pours, not the value of the project. You get a fixed quote before work begins, and standard delivery is 24–72 hours. Rush delivery is available. See pricing →
See full pricingFAQ
Length × width × thickness in feet gives cubic feet; divide by 27 for cubic yards. A 100-ft footing, 2 ft wide and 1 ft deep, is 200 cubic feet, or about 7.4 CY. We calculate each element from its section and detail.
Yes. Rebar is measured from the schedule and details and reported by bar size in tons or hundredweight (CWT). It can also be added to a metals package on request.
Yes. PT tendons and anchors are counted by quantity and length, and tilt-up panels are measured with their embeds, inserts and bracing as separate lines.
No. Quantities are net in place by default. We add your waste or over-excavation factor on request, or you can order a material takeoff with purchase quantities.
SFCA is square feet of contact area, the surface of formwork touching the concrete. It drives forming labor and material, so we report it separately from volume.
Length of each bar size × its weight per foot, converted to tons of 2,000 lb. For example, #5 bar weighs 1.043 lb per foot. We state the lap and chair allowance so you can adjust it.
Yes. Patching, resurfacing and structural repair are priced by area and condition.
Yes. Send the quote or your rate sheet and the estimate uses it in place of regional pricing.
Foundation and structural plans, sections, details and schedules. A geotechnical report helps when subgrade or over-excavation affects the quantities.
24–72 hours from receipt of a complete plan set. Large or phased projects get a confirmed date when we quote, and rush delivery is available.
Get Started
Most quotes go out within 10 minutes during business hours. Standard delivery is 24–72 hours.