Trades

Concrete estimating services

Our concrete estimating services measure and price Division 03 work for contractors, builders and developers: footings, slabs, walls, elevated decks, paving and site concrete. We report concrete in cubic yards, formwork by contact area and rebar by the ton, then price placement, finishing and curing to your market. Quantities start at $149 and priced estimates at $199, delivered in 24–72 hours.

24–72 hour turnaround
From $149
Typical variance ±5–10%
Every file checked by a second estimator
NDA on request

Scope

What We Measure

Every element is measured from the structural drawings, sections and details,
then reported in the unit your ready-mix supplier, form crew and rebar fabricator actually use.

10element types measured on every job
  • Footings, piers, grade beamsCYLF
  • Slab on grade and elevated decksCYSF
  • Foundation and retaining wallsCYSF
  • Columns, pilasters and thickened edgesCYEA
  • FormworkSFCA (contact area)
  • Rebar and welded wire meshTON / CWTSF
  • Post-tension tendons and anchorsEALF
  • Site concrete: curb, gutter, sidewalk, pavingLFSFCY
  • Finishing, curing, sealing, jointsSFLF
  • Accessories: vapor barrier, anchor bolts, embedsSFEA

Choose Your Deliverable

Takeoff or Priced Estimate: Which You Need

Choose by what you already have: your own rates and supplier prices,
or a bid-ready number built for you.

Quantity takeoff

$149

Cubic yards, SFCA and rebar tonnage, each traced to a sheet.

Added to price it

  • Labor hours
  • Material
  • Equipment
  • Placement costs

A foundation contractor with a settled labor rate and a ready-mix quote usually needs the takeoff.

A general contractor carrying the concrete package, or an owner checking a bid, usually needs the priced estimate.

For whole-job quantities, see quantity takeoff or a full cost estimate.

Cost Drivers

What Drives the Cost of Concrete Work

  • Formwork contact area

    Forming is often the largest labor item on walls, columns and elevated decks. We measure it in SFCA and separate it from the concrete volume.

    01
  • Rebar tonnage and congestion

    Weight sets the material cost, but heavy bar, tight spacing and many laps slow placement. We report both tonnage and bar size mix.

    02
  • Placement method

    Direct chute, pump, crane and bucket, or conveyor each change crew size, equipment cost and production rates.

    03
  • Finish level and flatness

    A broom finish, a power-troweled slab and a specified floor flatness (FF/FL) carry very different labor.

    04
  • Hot and cold weather

    Protection, heated enclosures, blankets and retarders or accelerators are priced as their own lines, following the specification.

    05
  • Mix design and testing

    Higher strengths, admixtures, fibers, and required cylinder testing all show up as separate items.

    06

Quality Control

Common Scope Gaps and Estimating Mistakes

Most concrete misses come from items the drawings never quite spell out.
These are the ones we check on every file.

7places concrete bids go wrong
  1. 01
    Slab edges and recesses not dimensioned

    Counted from structural and architectural sheets together, with conflicts logged

  2. 02
    Thickened slabs under bearing walls or equipment

    Measured as separate pours, not averaged into the slab

  3. 03
    Housekeeping pads drawn only on MEP sheets

    Cross-checked against mechanical and electrical plans

  4. 04
    Embeds, anchor bolts and sleeves with no owner

    Counted, and the file states who furnishes and who sets them

  5. 05
    Vapor barrier, base course and edge insulation

    Listed as separate lines, or marked excluded

  6. 06
    Curing, sealing and sawcut joints

    Priced in SF and LF, not left to the finish allowance

  7. 07
    Rebar carried by nobody

    The file states who supplies, places and chairs it

Project Types

Concrete Estimating By Project Type

Scope, units and risks shift with the kind of project,
so we measure each one the way its crew builds it.

  • Residential foundations and flatwork

    Footings, stem walls, slabs, garage floors, patios

    Crawlspace piersthickened edgesfrost depth
  • Commercial slab on grade and decks

    Floors, elevated slabs, columns, shear walls

    Formwork and shoringpour sequencefloor flatness
  • Tilt-up

    Casting slab, wall panels, pilasters

    Panel formingembedslift insertsbracing
  • Parking structures

    Post-tensioned or precast decks, ramps

    Tendons and anchorsjointssealers
  • Site concrete

    Curb, gutter, sidewalks, paving, ramps

    SubbasejointsreinforcementADA slopes

For earthwork and subbase, see sitework estimating. Foundation walls built from block belong with masonry estimating.

Our Method

How We Measure and Price

How we measure

We measure net in place from dimensions on plans, sections and details, and check each sheet's scale against a printed dimension. Formwork counts only surfaces that need a form; earth-formed footings do not. Rebar is taken from the schedules and details, converted with standard bar weights (a #5 bar weighs 1.043 lb per foot), and reported in tons with laps and chairs stated.

Sample Output

Sample Output

A short extract of what a concrete takeoff workbook looks like,
with every quantity traced to its source.

Illustrative example, not client work.

24 in.4 in. slab12 in. footingvapor barrier#5 rebarWhere these quantities come from
  • Continuous footings, 24 in. wide × 12 in. deep100 LF run
    7.4CY
  • Footing forms, both sides12 in. high
    200SFCA
  • Slab on grade, 4 in.2,000 SF
    24.7CY
  • Slab edge forms180 LF × 4 in.
    60SFCA
  • #5 rebar, grade 601,200 LF × 1.043 lb/ft
    0.63TON
  • Vapor barrierNet, before laps
    2,000SF

Deliverables

What You Receive

Every concrete file ships with these items,
ready to check, edit and bid from.

4files in every delivery
  • Unlocked Excel takeoff by element and pour

  • Rebar summary by bar size, with a bend list where the drawings detail one

  • Marked-up foundation and structural plans, colour-coded

  • Scope-gap log: slab edges, embeds and depressions the drawings do not resolve

Who We Serve

Who It's For

Concrete work is bid by many kinds of teams. These are the ones we work with most.

Concrete subcontractors and foundation contractors

General contractors carrying self-performed concrete

Builders pricing residential foundations and flatwork

Owners or lenders who want an independent check on a concrete number

Concrete subcontractors and foundation contractors

General contractors carrying self-performed concrete

Builders pricing residential foundations and flatwork

Owners or lenders who want an independent check on a concrete number

Concrete subcontractors and foundation contractors

General contractors carrying self-performed concrete

Builders pricing residential foundations and flatwork

Owners or lenders who want an independent check on a concrete number

Process

How it works

  1. Send your plans.

    Upload drawings, specs and addenda (PDF, DWG, DXF or most CAD formats). Tell us the bid date and scope. Include structural drawings, the rebar schedule and geotech notes if available.

  2. Get a fixed quote.

    We review the set and send a fixed price, usually within 10 minutes during business hours. Work starts when you approve it.

  3. Receive your files.

    Unlocked Excel, PDF summary and marked-up plans, checked by a second estimator. Revisions are included.

Pricing

Pricing and Turnaround

Published starting prices, and a fixed quote before any work begins.

Starting at$149quantity takeoff · priced estimates from $199

Concrete quantity takeoffs start at $149 and priced estimates at $199. The price follows the number of structural sheets and the complexity of the pours, not the value of the project. You get a fixed quote before work begins, and standard delivery is 24–72 hours. Rush delivery is available. See pricing →

See full pricing

FAQ

Frequently asked questions

01

How do you calculate cubic yards of concrete?

Length × width × thickness in feet gives cubic feet; divide by 27 for cubic yards. A 100-ft footing, 2 ft wide and 1 ft deep, is 200 cubic feet, or about 7.4 CY. We calculate each element from its section and detail.

02

Do you include rebar?

Yes. Rebar is measured from the schedule and details and reported by bar size in tons or hundredweight (CWT). It can also be added to a metals package on request.

03

Can you estimate post-tensioned or tilt-up work?

Yes. PT tendons and anchors are counted by quantity and length, and tilt-up panels are measured with their embeds, inserts and bracing as separate lines.

04

Is waste included?

No. Quantities are net in place by default. We add your waste or over-excavation factor on request, or you can order a material takeoff with purchase quantities.

05

What does SFCA mean?

SFCA is square feet of contact area, the surface of formwork touching the concrete. It drives forming labor and material, so we report it separately from volume.

06

How is rebar tonnage calculated?

Length of each bar size × its weight per foot, converted to tons of 2,000 lb. For example, #5 bar weighs 1.043 lb per foot. We state the lap and chair allowance so you can adjust it.

07

Do you price repairs and restoration?

Yes. Patching, resurfacing and structural repair are priced by area and condition.

08

Can you use my ready-mix supplier's pricing?

Yes. Send the quote or your rate sheet and the estimate uses it in place of regional pricing.

09

What drawings do you need?

Foundation and structural plans, sections, details and schedules. A geotechnical report helps when subgrade or over-excavation affects the quantities.

10

How long does a concrete takeoff take?

24–72 hours from receipt of a complete plan set. Large or phased projects get a confirmed date when we quote, and rush delivery is available.

Get Started

Send your plans for a fixed quote.

Most quotes go out within 10 minutes during business hours. Standard delivery is 24–72 hours.

Get a fixed quote

  • No obligationWork starts only when you approve the quote
  • Checked twiceEvery file reviewed by a second estimator
  • NDA on requestSigned before you send your files