Sitework estimating services

Our sitework estimating services cover CSI Divisions 31–33: clearing and demolition, earthwork, grading, underground utilities, paving, curb and walk, and erosion control. We calculate cut and fill from existing and proposed grades, separate import and export so haul costs stay visible, and count utility structures individually. Quantities start at $149 and priced estimates at $199, delivered in 24–72 hours.

24–72 hour turnaround
From $149
Typical variance ±5–10%
Every file checked by a second estimator
NDA on request

Scope

What We Measure

Every item is measured from the civil, grading and utility plans,
then reported in the unit your excavation and paving crews actually use.

10element types measured on every job
  • Clearing, stripping and demolitionACSFCY
  • Cut and fill, import and exportCY
  • Rough and fine gradingSF
  • Storm, sanitary and water pipe by sizeLF
  • Manholes, catch basins, valves, hydrantsEA
  • Aggregate base and asphalt pavingSFTON
  • Concrete paving, curb, gutter and sidewalkSFLF
  • Erosion control and stabilizationLFSF
  • Landscaping, topsoil and irrigationSFCYEA
  • Trench excavation, bedding and backfillCYLF

Choose Your Deliverable

Takeoff or Priced Estimate: Which You Need

Choose by what you already have: your own rates and supplier prices,
or a bid-ready number built for you.

Quantity takeoff

$149

Cut and fill, utility runs and paving areas, each traced to a sheet.

Added to price it

  • Labor hours
  • Material
  • Equipment
  • Haul costs

An excavation or utility contractor with its own equipment and haul rates usually needs the takeoff.

A general contractor carrying the site package, or a developer checking a bid, usually needs the priced estimate.

For whole-job quantities, see quantity takeoff or a full cost estimate.

Cost Drivers

What Drives the Cost of Sitework

  • Cut and fill balance

    A site that balances needs little import or export. One that does not carries haul and disposal costs on every extra yard.

    01
  • Haul distance

    Cost per yard changes with the distance to the borrow pit or disposal site, so we report import and export separately.

    02
  • Rock and unsuitable soils

    The geotechnical report can add rock excavation, undercut and replacement. We price each condition on its own line.

    03
  • Dewatering

    High groundwater adds pumping and equipment time, especially in utility trenches.

    04
  • Compaction and pavement section

    Specified compaction, base thickness and asphalt layers set both material tonnage and crew time.

    05
  • Utility depth and trench safety

    Deeper trenches add excavation, shoring or sloping, and slower production under OSHA excavation rules.

    06

Quality Control

Common Scope Gaps and Estimating Mistakes

Most sitework misses come from items the drawings never quite spell out.
These are the ones we check on every file.

7places sitework bids go wrong
  1. 01
    Topsoil stripping and respread

    Stripping depth and respread are measured separately, with the stockpile assumption stated

  2. 02
    Swell and shrink factors

    Stated as assumptions you can change, not buried in the volume

  3. 03
    Trench backfill material

    Bedding, select backfill and native backfill are listed separately

  4. 04
    Utility connections, taps and fees

    Marked as carried or excluded, with the plan note quoted

  5. 05
    Stormwater pollution prevention maintenance

    Priced for the project duration, not as a one-time install

  6. 06
    Offsite work and right-of-way improvements

    Counted when shown, and flagged when the plans point to other drawings

  7. 07
    Existing utilities to be protected or relocated

    Listed from the survey and demolition sheets, and conflicts are logged

Project Types

Sitework Estimating By Project Type

Scope, units and risks shift with the kind of project,
so we measure each one the way its crew builds it.

  • Commercial building pads

    Mass grading, pad certification, parking, utilities

    Pad importundercutpaving sections
  • Residential subdivisions

    Roads, utilities, lot grading, curb and gutter

    Phasinglot countsstorm and sewer structures
  • Industrial yards

    Heavy-duty paving, laydown areas, drainage

    Pavement thicknessstabilizationdetention
  • Public and roadway work

    Roadway sections, drainage, signage, markings

    Traffic controlquantities by bid itemrestoration
  • Site improvements

    Walks, ramps, retaining walls, landscaping

    ADA slopeswall footingstopsoil and plantings

For slab and foundation work, see concrete estimating.

Our Method

How We Measure and Price

How we measure

We calculate cut and fill from existing and proposed contours or spot grades on the civil drawings, with stripping depth and swell and shrink factors stated. Utilities are measured by run, size and material, and structures are counted individually. If you have CAD surfaces, send them. Each sheet's scale is checked against a printed dimension.

Sample Output

Sample Output

A short extract of what a sitework takeoff workbook looks like,
with every quantity traced to its source.

Illustrative example, not client work.

48 ft26 ftmeasured runSheet C-101Detail 4 / Rev 2Where these quantities come from
  • Topsoil stripping, 6 in.2.3 AC × 6 in.
    1,855CY
  • Cut to fill, netGrading plan C-201
    4,200CY
  • 12 in. storm pipeProfile sheets C-401 to C-403
    640LF
  • Catch basinsStorm schedule
    8EA
  • Aggregate base, 8 in.Paving plan C-301
    3,100SY
  • Concrete curb and gutterDetails C-501
    1,200LF

Deliverables

What You Receive

Every sitework file ships with these items,
ready to check, edit and bid from.

4files in every delivery
  • Unlocked Excel takeoff by work area and item

  • Cut and fill summary, with import and export shown

  • Utility schedule by run and structure

  • Marked-up civil plans, colour-coded

Who We Serve

Who It's For

Sitework is bid by many kinds of teams. These are the ones we work with most.

Excavation and site contractors

Utility and paving contractors

Developers checking a site bid

General contractors carrying the site package

Excavation and site contractors

Utility and paving contractors

Developers checking a site bid

General contractors carrying the site package

Excavation and site contractors

Utility and paving contractors

Developers checking a site bid

General contractors carrying the site package

Process

How it works

  1. Send your plans.

    Upload drawings, specs and addenda (PDF, DWG, DXF or most CAD formats). Tell us the bid date and scope. Include civil, grading and utility plans plus the geotechnical report if available.

  2. Get a fixed quote.

    We review the set and send a fixed price, usually within 10 minutes during business hours. Work starts when you approve it.

  3. Receive your files.

    Unlocked Excel, PDF summary and marked-up plans, checked by a second estimator. Revisions are included.

Pricing

Pricing and Turnaround

Published starting prices, and a fixed quote before any work begins.

Starting at$149quantity takeoff · priced estimates from $199

Sitework quantity takeoffs start at $149 and priced estimates at $199. The price follows the number of civil sheets and the size of the site, not the value of the project. You get a fixed quote before work begins, and standard delivery is 24–72 hours. Rush delivery is available. See pricing →

See full pricing

FAQ

Frequently asked questions

01

How do you calculate cut and fill?

From existing and proposed contours or spot grades on the civil drawings. If you have CAD surfaces, send them and we use those.

02

What are swell and shrink factors?

Soil expands when excavated (swell) and compacts when placed (shrink), so the volume you haul differs from the volume in place. We state the factors as assumptions you can change.

03

Do you account for topsoil stripping?

Yes. Stripping depth and respread are stated as assumptions and priced separately.

04

How do you convert asphalt to tons?

Area × thickness × a stated density. Hot mix asphalt is commonly figured at about 110 pounds per square yard for each inch of thickness, and we show the density we used.

05

Can you estimate subdivision infrastructure?

Yes, including roads, utilities and lot grading, by phase.

06

Do you include erosion control?

Yes. Silt fence, inlet protection, stabilization and maintenance are priced for the project duration.

07

Can you separate import and export?

Yes. They are reported separately so haul and disposal costs stay visible.

08

Do you price utility trenches?

Yes. Excavation, bedding, pipe, backfill and structures are measured by run and depth.

09

How long does a sitework takeoff take?

24–72 hours from receipt of a complete plan set. Large or phased sites get a confirmed date when we quote, and rush delivery is available.

10

What drawings do you need?

Civil, grading, utility and paving plans, details, and the geotechnical report if available.

Get Started

Send your plans for a fixed quote.

Most quotes go out within 10 minutes during business hours. Standard delivery is 24–72 hours.

Get a fixed quote

  • No obligationWork starts only when you approve the quote
  • Checked twiceEvery file reviewed by a second estimator
  • NDA on requestSigned before you send your files