Trades

Masonry estimating services

Our masonry estimating services cover Division 04: CMU, brick, stone and veneer, cast stone and architectural precast. We count units and wall area with openings deducted, measure grout and reinforcing, and price labor by wall type and height. Quantities start at $149 and priced estimates at $199, delivered in 24–72 hours.

24–72 hour turnaround
From $149
Typical variance ±5–10%
Every file checked by a second estimator
NDA on request

Scope

What We Measure

Every wall is measured from the elevations, plans and sections,
then reported in the unit your masons and suppliers actually use.

10element types measured on every job
  • CMU and brick walls, by type and sizeSFEA
  • Stone and thin veneerSF
  • Mortar and grout, including cell fillCYBAGS
  • Reinforcing and joint reinforcementLFTON
  • Lintels, sills and bond beamsLFEA
  • Ties, anchors and flashingEALF
  • Control and expansion jointsLF
  • Cast stone and precast trimEALF
  • Cleaning, sealing and repointingSF
  • Scaffolding and accessLSDURATION

Choose Your Deliverable

Takeoff or Priced Estimate: Which You Need

Choose by what you already have: your own rates and supplier prices,
or a bid-ready number built for you.

Quantity takeoff

$149

Units, wall area, mortar and grout, each traced to a sheet.

Added to price it

  • Labor hours
  • Material
  • Equipment
  • Scaffold costs

A mason or masonry contractor with its own production rates usually needs the takeoff.

A general contractor carrying the masonry package, or a builder pricing a facade, usually needs the priced estimate.

For whole-job quantities, see quantity takeoff or a full cost estimate.

Cost Drivers

What Drives the Cost of Masonry Work

  • Unit type and size

    Larger CMU lays faster than brick, and specialty units, stone and cast stone carry higher material and labor. Each is priced on its own.

    01
  • Wall height and scaffolding

    Taller walls need scaffold, lifts and extra handling, and production slows as the work moves up.

    02
  • Bond pattern

    Running bond, stack bond and decorative patterns change cutting, waste and laying time.

    03
  • Openings and corners

    Jambs, corners and returns take more labor than the field of the wall, so we count them separately.

    04
  • Grout and reinforcing

    Cell fill, vertical bars and bond beams add material, pours and inspection.

    05
  • Cold weather and cleaning

    Winter protection, heated mortar and final cleaning are priced as their own lines when the project calls for them.

    06

Quality Control

Common Scope Gaps and Estimating Mistakes

Most masonry misses come from items the drawings never quite spell out.
These are the ones we check on every file.

7places masonry bids go wrong
  1. 01
    Lintels carried by others

    Counted from the structural and architectural sheets, with the supplier stated

  2. 02
    Flashing and weeps

    Measured by length and counted at each opening and base

  3. 03
    Control joints

    Taken from the elevations and the specification

  4. 04
    Ties and anchors

    Counted by spacing from the wall sections

  5. 05
    Cell fill and grout

    Calculated from the cells to be filled, not an average per square foot

  6. 06
    Cutting at openings

    Counted as a labor condition at every jamb, head and sill

  7. 07
    Scaffolding and weather protection

    Priced as separate lines, by duration or your own rates

Project Types

Masonry Estimating By Project Type

Scope, units and risks shift with the kind of project,
so we measure each one the way its crew builds it.

  • CMU structural walls

    Load-bearing block, grout fill, reinforcing

    Bond beamscell fillvertical bars
  • Brick and stone veneer

    Facade brick, stone, ties, flashing

    Cornerssoldier coursessillsshelf angles
  • Restoration and repointing

    Tuck-pointing, patching, cleaning

    Area by conditionscaffoldsealants
  • Retaining and site walls

    Segmental block, CMU, footings

    Drainagegeogridcaps
  • Residential masonry

    Foundation block, fireplaces, veneers

    Chimneyshearthsveneer returns

Foundation walls and slabs are in concrete estimating, and steel lintels are in metals estimating.

Our Method

How We Measure and Price

How we measure

We measure wall area from the elevations and plans, deduct openings, and convert to unit counts using the unit size and joint thickness. A nominal 8×8×16 inch block covers 0.89 square feet of wall, or about 1.125 blocks per square foot, and modular brick runs about 6.75 units per square foot. Jambs, corners, lintels and bond beams are counted separately.

Sample Output

Sample Output

A short extract of what a masonry takeoff workbook looks like,
with every quantity traced to its source.

Illustrative example, not client work.

48 ft26 ftmeasured runSheet A-301Detail 4 / Rev 2Where these quantities come from
  • 8 in. CMU wall, net of openingsElevations A-301 to A-303
    3,000SF
  • 8×8×16 in. CMU units3,000 SF × 1.125 per SF
    3,375EA
  • Brick veneer, modularElevations A-301
    1,800SF
  • Modular brick units1,800 SF × 6.75 per SF
    12,150EA
  • Precast lintelsOpening schedule
    14EA
  • Joint reinforcementWall section 5/A-501
    4,800LF

Deliverables

What You Receive

Every masonry file ships with these items,
ready to check, edit and bid from.

4files in every delivery
  • Unlocked Excel takeoff by wall type and elevation

  • Unit, mortar and grout quantities

  • Labor hours by wall height and condition

  • Marked-up elevations and plans

Who We Serve

Who It's For

Masonry is bid by many kinds of teams. These are the ones we work with most.

Masonry contractors

General contractors carrying masonry packages

Builders pricing brick or stone facades

Restoration contractors pricing repointing

Masonry contractors

General contractors carrying masonry packages

Builders pricing brick or stone facades

Restoration contractors pricing repointing

Masonry contractors

General contractors carrying masonry packages

Builders pricing brick or stone facades

Restoration contractors pricing repointing

Process

How it works

  1. Send your plans.

    Upload drawings, specs and addenda (PDF, DWG, DXF or most CAD formats). Tell us the bid date and scope. Include elevations, wall sections and the masonry specification.

  2. Get a fixed quote.

    We review the set and send a fixed price, usually within 10 minutes during business hours. Work starts when you approve it.

  3. Receive your files.

    Unlocked Excel, PDF summary and marked-up plans, checked by a second estimator. Revisions are included.

Pricing

Pricing and Turnaround

Published starting prices, and a fixed quote before any work begins.

Starting at$149quantity takeoff · priced estimates from $199

Masonry quantity takeoffs start at $149 and priced estimates at $199. The price follows the number of sheets and the number of wall types, not the value of the project. You get a fixed quote before work begins, and standard delivery is 24–72 hours. Rush delivery is available. See pricing →

See full pricing

FAQ

Frequently asked questions

01

How many blocks per square foot?

About 1.125 for a standard 8×16 inch block, because its face covers about 0.89 square feet of wall.

02

How many bricks per square foot?

About 6.75 standard modular bricks per square foot with 3/8 inch mortar joints.

03

Do you deduct openings?

Yes. Openings are deducted, and their jambs, heads and sills are counted as separate conditions.

04

Do you include mortar and grout?

Yes. Mortar by wall area and unit type, and grout by cell fill, in cubic yards or bags.

05

Do you include restoration and repointing?

Yes. Restoration is priced by area and condition.

06

Can you include scaffolding?

Yes, as a duration-based line or using your own rates.

07

Do you count lintels and bond beams?

Yes, separately from the field of the wall.

08

Do you estimate stone veneer?

Yes. Natural and manufactured stone veneer are measured by area, with corners and returns counted separately.

09

How long does a masonry takeoff take?

24–72 hours from receipt of a complete plan set. Large projects get a confirmed date when we quote, and rush delivery is available.

10

What drawings do you need?

Elevations, plans, wall sections, details and the masonry specification.

Get Started

Send your plans for a fixed quote.

Most quotes go out within 10 minutes during business hours. Standard delivery is 24–72 hours.

Get a fixed quote

  • No obligationWork starts only when you approve the quote
  • Checked twiceEvery file reviewed by a second estimator
  • NDA on requestSigned before you send your files