Trades

Metals estimating services

Our metals estimating services cover Division 05: structural steel, joists and deck, stairs and rails, and miscellaneous metals. Steel is counted by member mark and tonnage against the structural drawings, so your bid and the fabricator's quote agree. Quantities start at $149 and priced estimates, including fabrication and erection, at $199, delivered in 24–72 hours.

24–72 hour turnaround
From $149
Typical variance ±5–10%
Every file checked by a second estimator
NDA on request

Scope

What We Measure

Every member is measured from the structural plans, elevations and schedules,
then reported in the unit your fabricator and erector actually use.

10element types measured on every job
  • Beams, columns and braces, by member markTONEA
  • Base plates, connections, anchor bolts and embedsEALB
  • Joists and joist girdersEATON
  • Metal deck (roof and composite floor)SF
  • Shear studsEA
  • Stairs, railings and laddersEALF
  • Lintels, angles and miscellaneous metalsLFEA
  • Grating and catwalksSF
  • Galvanizing, primer and intumescent coatingsSFLB
  • Light-gauge steel framingLF

Choose Your Deliverable

Takeoff or Priced Estimate: Which You Need

Choose by what you already have: your own rates and supplier prices,
or a bid-ready number built for you.

Quantity takeoff

$149

Tonnage by member mark, deck and miscellaneous metals, each traced to a sheet.

Added to price it

  • Labor hours
  • Material
  • Equipment
  • Erection costs

A steel erector or fabricator with its own pricing usually needs the takeoff.

A general contractor carrying the steel package, or an owner checking a bid, usually needs the priced estimate.

For whole-job quantities, see quantity takeoff or a full cost estimate.

Cost Drivers

What Drives the Cost of Metals and Structural Steel Work

  • Tonnage and piece count

    Weight sets the material cost, and the number of pieces sets handling and erection time. We report both by shape and member mark.

    01
  • Connection type

    Bolted, welded and moment connections differ in material and labor. Connection weight is added as a stated percentage or counted where details are drawn.

    02
  • Coatings

    Galvanizing, primer and intumescent coatings are priced by surface area or weight, and they can change both cost and schedule.

    03
  • Erection sequence and crane

    Crane size, pick weights and the number of lifts drive equipment cost and production.

    04
  • Miscellaneous metals volume

    Stairs, rails, lintels and supports are labor-heavy for their weight and are priced item by item.

    05
  • Lead times

    Steel, joists and deck have lead times that can decide whether a price holds, so each is flagged with the date the price was pulled.

    06

Quality Control

Common Scope Gaps and Estimating Mistakes

Most steel misses come from items the drawings never quite spell out.
These are the ones we check on every file.

7places steel bids go wrong
  1. 01
    Miscellaneous metals lumped together

    Listed item by item, never rolled into a lump sum

  2. 02
    Embeds and anchor bolts

    Counted and assigned, and the file states who furnishes and who sets them

  3. 03
    Lintels

    Taken from the structural and architectural sheets, with the supplier stated

  4. 04
    Stair and rail details

    Measured from the details by unit and length

  5. 05
    Deck edge angles and closures

    Counted from the roof and floor edge details

  6. 06
    Connection weight allowance

    Stated as a percentage or counted from the details

  7. 07
    Shear studs and deck accessories

    Counted from the composite beam notes and deck details

Project Types

Metals and Structural Steel Estimating By Project Type

Scope, units and risks shift with the kind of project,
so we measure each one the way its crew builds it.

  • Commercial steel frames

    Beams, columns, braces, joists, deck

    Moment connectionsshear studsfireproofing interface
  • Industrial buildings and pipe racks

    Heavy framing, crane rails, platforms, racks

    Crane runwaygratingequipment supports
  • Miscellaneous metals packages

    Stairs, rails, ladders, lintels, supports

    Finishshop coatingsattachment hardware
  • Residential steel and light-gauge

    Steel beams, posts, light-gauge framing

    Beam pocketstemporary shoringconnections
  • Mezzanines and platforms

    Framing, decking, stairs, guardrail

    Loadinggratingaccess

Rebar is measured with concrete estimating and can be added to a metals package on request.

Our Method

How We Measure and Price

How we measure

Steel is counted by member mark from the framing plans, elevations and schedules, then converted to weight using the published weight per foot for each shape, so a W12×26 is carried at 26 pounds per foot. Connections are added as a stated percentage or counted where the details are drawn. Each sheet's scale is checked against a printed dimension.

Sample Output

Sample Output

A short extract of what a metals takeoff workbook looks like,
with every quantity traced to its source.

Illustrative example, not client work.

48 ft26 ftmeasured runSheet S-201Detail 4 / Rev 2Where these quantities come from
  • W12×26 beamsFraming plan S-201
    1,040LF
  • W12×26 beam weight1,040 LF × 26 lb/ft ÷ 2,000
    13.5TON
  • W10×33 columnsColumn schedule
    18EA
  • 24K steel joistsJoist schedule
    36EA
  • Roof deck, 1.5 in., 22 gaRoof framing plan
    14,200SF
  • Shear studs, 3/4 in.Composite beam notes
    640EA

Deliverables

What You Receive

Every metals file ships with these items,
ready to check, edit and bid from.

4files in every delivery
  • Unlocked Excel takeoff by member type and mark

  • Tonnage summary for fabricator quotes

  • Erection labor and crane time, in priced estimates

  • Marked-up structural plans

Who We Serve

Who It's For

Steel work is bid by many kinds of teams. These are the ones we work with most.

Steel fabricators and erectors

Miscellaneous metals subcontractors

General contractors carrying the steel package

Rebar contractors pricing alongside steel

Steel fabricators and erectors

Miscellaneous metals subcontractors

General contractors carrying the steel package

Rebar contractors pricing alongside steel

Steel fabricators and erectors

Miscellaneous metals subcontractors

General contractors carrying the steel package

Rebar contractors pricing alongside steel

Process

How it works

  1. Send your plans.

    Upload drawings, specs and addenda (PDF, DWG, DXF or most CAD formats). Tell us the bid date and scope. Include structural drawings, details and the steel specification.

  2. Get a fixed quote.

    We review the set and send a fixed price, usually within 10 minutes during business hours. Work starts when you approve it.

  3. Receive your files.

    Unlocked Excel, PDF summary and marked-up plans, checked by a second estimator. Revisions are included.

Pricing

Pricing and Turnaround

Published starting prices, and a fixed quote before any work begins.

Starting at$149quantity takeoff · priced estimates from $199

Metals quantity takeoffs start at $149 and priced estimates, including fabrication and erection, at $199. The price follows the number of structural sheets and the number of different members, not the value of the project. You get a fixed quote before work begins, and standard delivery is 24–72 hours. Rush delivery is available. See pricing →

See full pricing

FAQ

Frequently asked questions

01

How is steel tonnage calculated?

Length of each member times its published weight per foot, summed by shape and converted to tons of 2,000 pounds. A W12×26 weighs 26 pounds per foot.

02

Do you include connection weight?

Yes. Connection material is added as a stated percentage or counted where the details are drawn.

03

Do you count miscellaneous metals separately?

Yes, item by item. They are the most common scope gap in a steel bid, so we never roll them into a lump sum.

04

How do you take off joists and deck?

Joists by mark and length from the joist schedule and framing plan, and deck by area and gauge from the roof or floor framing plan.

05

Is rebar covered here?

Rebar is measured with concrete estimating and can be included in a metals package on request.

06

Do you price galvanizing and coatings?

Yes. Galvanizing, primer and intumescent coatings are priced as their own lines by surface area or weight.

07

Can you price erection?

Yes, in priced estimates: labor hours, crane time and equipment by erection sequence.

08

Do you estimate stairs and railings?

Yes, from the stair and railing details, by unit and length.

09

How long does a metals takeoff take?

24–72 hours from receipt of a complete plan set. Large projects get a confirmed date when we quote, and rush delivery is available.

10

What drawings do you need?

Structural framing plans, elevations, details, schedules and the steel specification.

Get Started

Send your plans for a fixed quote.

Most quotes go out within 10 minutes during business hours. Standard delivery is 24–72 hours.

Get a fixed quote

  • No obligationWork starts only when you approve the quote
  • Checked twiceEvery file reviewed by a second estimator
  • NDA on requestSigned before you send your files