Quantity takeoff
$149Duct, pipe, fixture and equipment quantities, each traced to a sheet.
Trades
Our MEP estimating services price mechanical (HVAC), plumbing and fire protection systems by system, not by allowance. Pipe and duct are measured by size and material, fixtures and equipment are counted from the schedules, and risers are followed so vertical runs are not missed. Electrical has its own page: electrical estimating. Quantities start at $149 and priced estimates at $199, in 24–72 hours.
Scope
Every system is measured from the mechanical, plumbing and fire protection plans,
then reported in the unit your suppliers and crews actually use.
10element types measured on every jobChoose Your Deliverable
Choose by what you already have: your own rates and supplier prices,
or a bid-ready number built for you.
Duct, pipe, fixture and equipment quantities, each traced to a sheet.
A bid-ready number at local rates, or your own.
A mechanical or plumbing subcontractor with its own labor factors usually needs the takeoff.
A general contractor carrying the MEP package, or an owner checking sub pricing, usually needs the priced estimate.
For whole-job quantities, see quantity takeoff or a full cost estimate.
Cost Drivers
Quality Control
Most MEP misses come from items the drawings never quite spell out.
These are the ones we check on every file.
7places MEP bids go wrongRiser and flow diagrams are followed floor by floor, and heights are carried into the pipe length
Listed as carried or excluded, with the drawing note quoted
Counted and assigned, and the file states who furnishes them
Counted from the mechanical plans and cross-checked against the roof plan
Large duct and pipe runs are checked against the sections, and conflicts are logged
The file states whether design is included or by others
Priced as separate lines, or marked excluded
Project Types
Scope, units and risks shift with the kind of project,
so we measure each one the way its crew builds it.

Furnaces, condensers, ductwork, fixtures, water heaters
Zoningventinggas piping
Rooftop units, VAV boxes, distribution, restrooms
Ceiling distributioncontrolssprinklers
Air handling, medical gas, exhaust, hot water
Pressure controlspecialty pipingredundancy
Process and utility piping, pumps, tanks
Pipe supportsweldingtesting
Risers, unit fixtures, corridor ventilation
Repeated unitsriser isolationsprinklersFor power and low-voltage systems, see electrical estimating.
Our Method
We measure duct by size and gauge and convert to weight, measure pipe by size and material along the routes shown, and count fixtures, devices and equipment from the schedules. Risers and flow diagrams are followed floor by floor so vertical runs are not missed. Each sheet's scale is checked against a printed dimension.
We work in Bluebeam Revu, PlanSwift and On-Screen Takeoff, and read duct and sprinkler requirements against the standards the specification cites, such as SMACNA duct construction standards and NFPA 13 for sprinkler systems. Labor factors adjust for height and congestion, rates follow the project's zip code or your own, and a second estimator reviews every file.
Sample Output
A short extract of what an MEP takeoff workbook looks like,
with every quantity traced to its source.
Illustrative example, not client work.
Deliverables
Every MEP file ships with these items,
ready to check, edit and bid from.
4files in every deliveryUnlocked Excel takeoff by system, size and material
Equipment list taken from the schedules
Labor hours by system
Marked-up mechanical, plumbing and fire protection plans
Who We Serve
MEP work is bid by many kinds of teams. These are the ones we work with most.
Process
Upload drawings, specs and addenda (PDF, DWG, DXF or most CAD formats). Tell us the bid date and scope. Include MEP plans, schedules, riser diagrams and specifications.
We review the set and send a fixed price, usually within 10 minutes during business hours. Work starts when you approve it.
Unlocked Excel, PDF summary and marked-up plans, checked by a second estimator. Revisions are included.
Pricing
Published starting prices, and a fixed quote before any work begins.
MEP quantity takeoffs start at $149 and priced estimates at $199. The price follows the number of sheets and the number of systems, not the value of the project. You get a fixed quote before work begins, and standard delivery is 24–72 hours. Rush delivery is available. See pricing →
See full pricingFAQ
MEP covers mechanical, electrical and plumbing together. This page covers mechanical (HVAC), plumbing and fire protection, and electrical has its own page. We can combine all three on request.
Yes, if you need all three. For electrical only, see electrical estimating.
From the sprinkler plans and riser diagrams, by head type and coverage area, with mains and branch lines measured by size.
By weight. We measure duct by size and gauge, convert to pounds of sheet metal, and price fabrication and installation separately.
Yes, from single-family homes to multi-family buildings.
Bluebeam Revu, PlanSwift and On-Screen Takeoff for takeoffs. Files are delivered as unlocked Excel, with CSV exports for your own estimating software.
Yes. We price from the concept drawings, state every assumption, and the budget tightens as the design develops.
Yes, as separate lines, following the specification.
24–72 hours from receipt of a complete plan set. Large or phased projects get a confirmed date when we quote, and rush delivery is available.
Mechanical, plumbing and fire protection plans, schedules, riser and flow diagrams, and specifications.
Get Started
Most quotes go out within 10 minutes during business hours. Standard delivery is 24–72 hours.