Trades

Lumber takeoff services

Our lumber takeoff services count every framing member on your plans, including studs, plates, headers, joists, rafters, trusses, sheathing, engineered lumber and hardware, by size and length and ready for your lumber yard. Wood-framed homes, multi-family and light commercial projects are delivered in 24–72 hours. Quantities start at $149 and priced estimates at $199.

24–72 hour turnaround
From $149
Typical variance ±5–10%
Every file checked by a second estimator
NDA on request

Scope

What We Count

Every member is counted from the framing plans, sections and schedules,
then listed in the size and length your lumber yard stocks.

10element types measured on every job
  • Dimensional lumber (2×4 to 2×12) by lengthEABF
  • Plates, studs, headers, cripples, blockingEALF
  • Floor joists, rafters, ridge and beamsEALF
  • Engineered lumber: LVL, glulam, I-joistsEALF
  • Trusses (roof and floor)EA
  • Sheathing and subfloorSHEETSSF
  • Connectors, hangers and hold-downsEA
  • Fasteners and adhesivesBOXEA
  • Exterior and interior trim, siding, deckingLFSF
  • Temporary bracingLS

Choose Your Deliverable

Takeoff or Priced Estimate: Which You Need

Choose by what you already have: your own rates and supplier prices,
or a bid-ready number built for you.

Quantity takeoff

$149

Lumber by size and length, sheathing and hardware, each traced to a sheet.

Added to price it

  • Labor hours
  • Material
  • Equipment
  • Installation costs

A framer or builder with a lumber yard account usually needs the takeoff.

A general contractor carrying the framing package, or a lender checking a budget, usually needs the priced estimate.

For whole-job quantities, see quantity takeoff or a full cost estimate.

Cost Drivers

What Drives the Cost of Lumber and Framing Work

  • Stud spacing and wall height

    Studs at 16 or 24 inches on center, and walls taller than standard stock lengths, change both piece count and waste.

    01
  • Engineered lumber

    LVL, glulam and I-joists cost more per foot than dimensional lumber, and they are listed by mark so the order matches the schedule.

    02
  • Truss or stick framing

    Trusses move labor off site and add delivery and crane time, while stick framing adds cutting and labor on site. Each is priced on its own terms.

    03
  • Shear walls and hold-downs

    Sheathing nailing patterns, hold-downs and straps add material and labor that a flat factor misses.

    04
  • Sheathing type

    Thickness, grade and any exposure rating change the price of every sheet.

    05
  • Hardware and fasteners

    Hangers, ties and structural screws add up quickly on multi-family and engineered framing.

    06

Quality Control

Common Scope Gaps and Estimating Mistakes

Most framing misses come from items the drawings never quite spell out.
These are the ones we check on every file.

7places framing bids go wrong
  1. 01
    Blocking and backing

    Counted from the details for cabinets, rails, fixtures and wall-mounted items

  2. 02
    Fire blocking and draftstopping

    Taken from the code notes and wall sections

  3. 03
    Headers and cripples at openings

    Counted from the opening schedule, not averaged into the wall

  4. 04
    Shear nailing and panel edge schedules

    Read from the structural notes and priced with the sheathing

  5. 05
    Connectors and hardware

    Counted from the plans and details, by type and size

  6. 06
    Temporary bracing

    Listed as its own line for the framing sequence

  7. 07
    Deck, porch and exterior framing

    Measured from the exterior elevations and deck details

Project Types

Lumber and Framing Estimating By Project Type

Scope, units and risks shift with the kind of project,
so we measure each one the way its crew builds it.

  • Single-family homes

    Floor, wall and roof framing, sheathing, hardware

    Headersbeamsengineered lumberstairs
  • Production homes

    Plan and elevation packages repeated across lots

    Option packagesplan-level listselevation changes
  • Multi-family wood frame

    Podium or stick-built floors, party walls, roofs

    Fire-rated wallsshear panelsrepeated units
  • Light commercial

    Wood-framed offices and retail, trusses, canopies

    Truss layoutsblockingstorefront rough openings
  • Additions and remodels

    Tie-ins, new floors and roofs, structural changes

    Shoringexisting conditionstemporary bracing

For interior finishes, see finishes estimating; for the roof covering, see roofing estimating.

Our Method

How We Measure and Price

How we measure

Wall framing follows your stud spacing and opening layout, not a flat studs-per-foot factor. Members are listed by size and stock length, and board feet are calculated as thickness in inches times width in inches times length in feet, divided by 12. Nominal sizes are converted correctly, so a 2×4 is carried as the 1.5 by 3.5 inch member it is.

Sample Output

Sample Output

A short extract of what a lumber takeoff workbook looks like,
with every quantity traced to its source.

Illustrative example, not client work.

48 ft26 ftmeasured runSheet A-201Detail 4 / Rev 2Where these quantities come from
  • 2×4×92-5/8 in. precut studs16 in. on center, plus corners and openings
    412EA
  • 2×4×16 ft platesTop and bottom plates
    96EA
  • 2×10×16 ft floor joistsFraming plan S-201
    72EA
  • 1-3/4 × 11-7/8 in. LVL beamsBeam schedule
    6EA
  • 7/16 in. OSB wall sheathing5,888 SF ÷ 32 SF
    184SHEETS
  • Roof trussesTruss layout
    22EA

Deliverables

What You Receive

Every lumber file ships with these items,
ready to check, edit and bid from.

4files in every delivery
  • Lumber list by size and length, in Excel

  • Board-foot summary

  • Sheathing and hardware lists

  • Marked-up framing plans

Who We Serve

Who It's For

Framing is bid by many kinds of teams. These are the ones we work with most.

Framers and framing subcontractors

Home builders and remodelers

Lumber yards turning plans into quotes

Multi-family wood-frame contractors

Framers and framing subcontractors

Home builders and remodelers

Lumber yards turning plans into quotes

Multi-family wood-frame contractors

Framers and framing subcontractors

Home builders and remodelers

Lumber yards turning plans into quotes

Multi-family wood-frame contractors

Process

How it works

  1. Send your plans.

    Upload drawings, specs and addenda (PDF, DWG, DXF or most CAD formats). Tell us the bid date and scope. Include framing plans, wall sections and truss layouts if available.

  2. Get a fixed quote.

    We review the set and send a fixed price, usually within 10 minutes during business hours. Work starts when you approve it.

  3. Receive your files.

    Unlocked Excel, PDF summary and marked-up plans, checked by a second estimator. Revisions are included.

Pricing

Pricing and Turnaround

Published starting prices, and a fixed quote before any work begins.

Starting at$149quantity takeoff · priced estimates from $199

Lumber quantity takeoffs start at $149 and priced estimates at $199. The price follows the number of framing sheets and the complexity of the layout, not the value of the project. You get a fixed quote before work begins, and standard delivery is 24–72 hours. Rush delivery is available. See pricing →

See full pricing

FAQ

Frequently asked questions

01

How are board feet calculated?

Thickness in inches times width in inches times length in feet, divided by 12. A 2×4×8 is about 5.33 board feet.

02

Do you use a studs-per-foot rule?

No. We count studs from the wall layout, spacing and openings, then add corners, partitions and blocking instead of using a flat factor.

03

Can you format the list for my lumber yard?

Yes. Send their order format and we will match it.

04

Do you include trusses?

Yes, counted from the truss layout. If the layout is not designed yet, we list the assumption.

05

Can you price the lumber?

Yes, at current regional prices or your supplier's pricing.

06

Do you count engineered lumber?

Yes. LVL, glulam and I-joists are listed by size, length and mark from the beam and joist schedules.

07

Do you include hardware and connectors?

Yes. Hangers, hold-downs and straps are counted from the plans and details.

08

Do you provide a cut list?

Yes, where it saves material, by stock length.

09

How long does a lumber takeoff take?

24–72 hours from receipt of a complete plan set. Large projects get a confirmed date when we quote, and rush delivery is available.

10

What drawings do you need?

Framing plans, wall sections, truss layouts and the structural notes. Elevations and details help.

Get Started

Send your plans for a fixed quote.

Most quotes go out within 10 minutes during business hours. Standard delivery is 24–72 hours.

Get a fixed quote

  • No obligationWork starts only when you approve the quote
  • Checked twiceEvery file reviewed by a second estimator
  • NDA on requestSigned before you send your files